Woolcombe
Yonge Solicitors
Installation
in their listed office building of six Daikin inverter heat pump
split systems using R410a as a refrigerant. These systems qualified
for the enhanced capital allowance scheme.
We
installed these systems in the six offices most affected by excess
heat due to electrical equipment, occupation levels and solar heat
gain.
•
6 x Daikin inverter heat pump split systems.
Charles
Parry (managing partner)
A first class installation delivered on time with no disruption
to our business and with minimal visible impact on the buildings
interior. This has since been followed up by excellent after sales
service including their comprehensive planned maintenance contract.



Rouse
and Co.
Maintenance
of their Daikin air conditioning and ventilation systems installed
in their offices and conference facilities.
•
1 x Daikin four way blow cassette heat-pump system.
• 1 x Daikin wall mounted heat-pump
system.
• 2 x Daikin VRV + systems linked
to 54 fan coils
• 1 x Air Handling Unit
• 1 x Daikin intelligent manager
control system.
Neil
Relph (senior partner)
Since changing to Air Management Solutions on all of our air
conditioning and ventilation maintenance and remedials, we have
nothing but praise for their engineers and management team.
Any
faults are dealt with promptly and their engineers are always punctual
and polite in fact we hardy know they are here at all during servicing.
I feel I can’t recommend them enough.

South
West Water
Installation
of an inverter heat-pump air conditioning system in their crown
hill offices. This system qualifies for the enhanced capital allowance
scheme.
•
1 x Daikin inverter heat-pump split system
The
wall mounted fan coil was mounted in a first floor office with the
condensing unit at ground level with all the interconnecting pipe-work
fastened to galvanised cable tray.
Lovell
Rugby Ltd
Installation in their new industrial unit of three Daikin inverter
heat-pump systems that use R410a as a refrigerant. All these system
qualified for the enhanced capital allowance scheme.
•
3 x Daikin inverter heat-pump split systems.
The
two wall mounted systems were installed in the two first floor offices,
and the cassette was installed in the despatch office.
Bob
Lovell (managing director)
A very competitive package, excellent installation followed
up by good after sales service.
|